Pampa Energía Wind Farm IV (‘PEPE IV’)
PEPE IV, originally an expansion of PEPE III (Pampa Energía Wind Farm III), is located in Coronel Rosales, on national route No. 3, 45 km from the City of Bahía Blanca, Province of Buenos Aires. Comprised by 18 Vestas V-150 wind turbines of 105-meter hub height and a 63% load factor of P50 each, PEPE IV was commissioned on June, 2023 reaching a total installed capacity of 81 MW:
- 4 wind turbines commissioned on December 29, 2022
- 4 wind turbines commissioned on February 25, 2023
- 2 wind turbines commissioned on April 4, 2023
- 2 wind turbines commissioned on May 11, 2023
- 3 wind turbines commissioned on June 3, 2023
- 3 wind turbines commissiones on June 17, 2023
Technical Data
Plant | Unit | Installed Capacity(MW) | Start-Up | Type of Unit |
PEPE IV | PEP3EO | 81 | 2023 | 18 wind generators |