Pampa Energía Wind Farm III (‘PEPE III’)
PEPE III is PEPE II (Pampa Energía Wind Farm II)’s twin wind farm, located in Coronel Rosales, on national route No. 3, 45 km from the City of Bahía Blanca, Province of Buenos Aires. It was also commissioned on May 10, 2019, selling its energy in the Renewable Energy Term Market (‘MAT ER’). Since its commissioning and during 2019, PEPE III generated 148 GWh, which represents an approximate 50% dispatch factor. Both PEPE II and PEPE III are assets fully owned by Pampa.
The following chart shows certain relevant statistical data on PEPE III:
2018(1) | 2019 | |
Net Generation (GWh) | – | 148 |
Purchases of Energy (GWh) | – | 6 |
Total Energy Sales (GWh) | – | 154 |
Average Price (US$/MWh) | – | 65 |
Average Gross Profit (US$/MWh) | – | 55 |
Note: Gross Margin before depreciation and amortization, values expressed in nominal terms. AR$/US$ exchange rate: 2018 – 28.13; 2019 – 48.23. (1) PEPE III was commissioned on May 10, 2019.
Technical Data
Plant | Unit | Installed Capacity(MW) | Start-Up | Type of Unit |
PEPE III | BAHIEO | 53 | 2019 | 14 wind generators |