Pampa Energía Wind Farm III (‘PEPE III’)

PEPE III is located in the City of Coronel Rosales, 25 kilometers away from the City of Bahía Blanca. The wind farm consists of 14 wind turbines each, by which each turbine is made up of four tower sections, a nacelle and three blades driving the turbine with a total diameter of 136 meters. PEPE III was commissioned for service on May 10, 2019, under Res. No. 281-E/2017 passed by the former Ministry of Energy and Mining (‘MEyM’) for the Renewable Energy Term Market (‘MAT ER’), and sells its energy to large electricity consumption users through power purchase agreements (‘PPAs’) between private parties.